Here Is Information On South Hill VA Modular Homes

By Anthony Jones


Modular homes are types of houses that are constructed in a factory environment in form of modules. Each module is made separately and independently prior to being joined together to make the complete house. The quality control department of the manufacturer pays close attention to the production process to ensure that standards are met. Because of strict quality control, all modules end up being of the same quality. This is what South Hill VA modular homes entail.

These structures are usually not subjected to elements of weather like houses built traditionally are. That means that the production process is no interrupted by bad weather. As such, production can be done very fast. Also, the company can maintain a night shift crew that continues with the production even at night. In the end, the house is produced very fast.

Traditional construction of houses is affected by several factors like weather. When a storm comes, all construction activities have to be stopped until the storm passes. Also, the construction takes place during the day only in most instances, with the crew going back to their houses in the evening. This brings about delay in the construction. The house ends up taking up to several months to be completed and be ready for occupation.

Many people are opting for modular houses because of the ease of construction that is involved. Modules can be produced very fast, with the average time being four weeks. Once the modules have been constructed, they are covered using appropriate material to protect them from elements of the weather during transportation. They are then transported to the site of installation where they are installed.

A foundation is usually made in advance at the site where the modules will be installed. Each module is installed individually on the foundation. The modules are offloaded from the transporting truck by use of a crane. They are placed onto the foundation by the crane in the required position. How this should be done is planned in advance.

Although the mean time for construction of the modules is 4 weeks, the time may vary a lot. Factors such as the design of the structure usually determine how long the duration takes. Complex structures take long due to the fact that there is a lot of designing and planning that is involved. The size of the structure will also determine the duration because structures with more modules require more time.

The process of installation requires additional time so as to be completed. The installation may be carried out by local builders or the production firm. A majority of firms prefer to install the structures themselves but this decision lies with the homeowner. The client has to decide if they prefer the manufacturer to do the installation too or if they prefer an external contractor. This decision can be influenced by various factors.

It is important to note that modular homes are not the same as mobile houses. The first difference between these two kinds of structures is mobility. Whereas mobile houses are mobile, modular homes are not mobile. They are installed on permanent foundations, which prevents them from being able to be moved.